Skip to Main Content
Sage 200 UKI Ideas Portal

Please note the following Sage 200 Ideas Portal Guidelines apply to the use of this portal.

ADD A NEW IDEA

Clear

Ideas

Showing 13

Ability to turn off cost centre & department references in Sage 200 nominal references

We have a number of Sage 200 sites that have requested that it would be good to be able to suppress the cost centre & department columns in the nominal account dropdown selectors used throughout Sage 200 if the customer does not use them. for ...
Guest over 6 years ago in Settings 0 Idea Accepted - Gauging Support

Sage 200 Standard - BOM allocation

We need to be able to allocate stock from a BOM and build when the item is physically built. Without this function we have only 2 options (1) build at the start but if the physical build is then not for a few weeks the physical stock quantities fo...
Guest about 3 years ago in Processing 0 Idea Accepted - Gauging Support

Option to remove batch postings only tick box nominal ledger settings

Users frequently tick the 'post batch totals only' option when setting up nominal codes without realising the implications of doing so. This results in imbalanced URNs due to the way the nominal postings are then made for those accounts (e.g. a pu...
Vicky Poole about 7 years ago in Settings 0 Idea Accepted - Gauging Support

Facility to remove Cost Centre amp; Depts from Screens

Have had a few requests on this Where a client/company is not using Cost Centres or Departments in NL, would be great to have the an option to disable/hide all columns/boxes/search boxes etc. for CC amp; Dept. So that when processing transactions ...
Paul Daly almost 10 years ago in Settings 0 Idea Accepted - Gauging Support

Opportunity to substitute items out of stock when processing a BOM to an alternative

Would it be possible to amend BOM to give users the opportunity to substitute any component items which are out of stock to use an alternative when processing the build, rather than users having to go into the BOM record and change it manually?
Guest over 9 years ago in Processing 0 Idea Accepted - Gauging Support

Make Cost Centres / Departments mandatory

Have a parameter in each module to make the cost centre and / or department mandatory for the nominal postings. This will ensure that postings are more accurate and errors eliminated.
Guest about 11 years ago in Settings 0 Idea Accepted - Gauging Support

Nominal account - report category

Within the the nominal account - account settings, have the ability to change all three fields relating to the "Report Category". Thus ensuring accurate reporting directly from sage 200 and not exporting the data into another software and then rep...
Marek Tonderys about 2 years ago in Settings 4 Not an idea

Add a Deselect option for unassigning batch/serial numbers from a BOM Build

Currently, when building a BOM within Record Built Items, serial numbered components are auto-selected. Sometimes this is fine but sometimes it is not correct. Although you can manually change these if you have 600 (in the case of my client) they ...
Michelle White almost 8 years ago in Processing 0 Idea Accepted - Gauging Support

BOM rounding errors in units of measure

This can create error in works order processing and needs resolving
Guest about 10 years ago in Processing 0 Idea Accepted - Gauging Support

Stock return to deal with by products

A means to send by-products to stock. If we modify a build item and a modification done, i.e. the removed component could be re-used, through the build process and the bill of materials, effectively have two complete build parts. We buy a bike, we...
Guest almost 4 years ago in Processing 0 Idea Accepted - Gauging Support