Skip to Main Content
Sage 200 UKI Ideas Portal

Please note the following Sage 200 Ideas Portal Guidelines apply to the use of this portal.

ADD A NEW IDEA

Clear

Ideas

Showing 31

Bill of Materials - Components Tab- Functional Right click features

When amending an existing Bill of Material, within the Component tab the options shown when right clicking on a component line are greyed out and are not functional. The function to delete the row is not available therefore users must click to del...
Guest over 3 years ago in New/Amend BOM 0 Idea Accepted - Gauging Support

Making a BOM from an Item

Is there a quick way of making a BOM from a stock item? It feels like I am currently entering a lot of info twice! Or vice versa, can I make the BOM first and then make the stock item from the BOM? Or, even better, is there a way of linking the 2 ...
Guest over 2 years ago in New/Amend BOM 0 Idea Accepted - Gauging Support

Opportunity to substitute items out of stock when processing a BOM to an alternative

Would it be possible to amend BOM to give users the opportunity to substitute any component items which are out of stock to use an alternative when processing the build, rather than users having to go into the BOM record and change it manually?
Guest over 9 years ago in Processing 0 Idea Accepted - Gauging Support

Bill of materials - Ability to rearrange toolbar icons please!

We are able to select which icons appear in toolbars but cannot rearrange. eg. Having delete in the current location seems illogical as is View. Drag and drop interfaces are commonplace in most applications nowadays, can we have it too please?
Guest over 4 years ago in List 0 Idea Accepted - Gauging Support

Reports that have criteria for Analysis Codes should only list values in the drop down list that are present in the analysis code used in the criteria

eg the default reports installed show all analysis codes in the drop down lists when you click on Criteria, each report has to be amended to restrict the values.
Saeed Malik about 7 years ago in Criteria 0 Idea Accepted - Gauging Support

Is there a quicker way of viewing all operations and components of a BOM?

Currently, to check the operations times and components list for a BOM, I have to make a construction report which is quite long winded and difficult to read. All I need is a table with operations and there times and a list of all the components. ...
Guest over 2 years ago in New/Amend BOM 0 Idea Accepted - Gauging Support

Bill of Materials update components

Is it possible to have something similar to Excels find and replace option for Bill of materials, so you could update a components on all BOM with the same component Instead of finding all the BOMs that need updating and manually changing each one?
Guest over 2 years ago in New/Amend BOM 1 Already Exists

Add a Deselect option for unassigning batch/serial numbers from a BOM Build

Currently, when building a BOM within Record Built Items, serial numbered components are auto-selected. Sometimes this is fine but sometimes it is not correct. Although you can manually change these if you have 600 (in the case of my client) they ...
Michelle White almost 8 years ago in Processing 0 Idea Accepted - Gauging Support

Improve reporting on Bill or Materials

Sage 200 Standard allows you to build a finished item made up of components and Sub Assemblies. There is currently no way of reporting on the unit cost of each component/ sub assembly other than 'knowing' what the average buying price/ Standard Co...
Guest about 8 years ago in Reports 0 Idea Accepted - Gauging Support

To have the option to enter leading zeros on Report Criteria

It can be quite time consuming have to enter the leading zeros when filling out a criteria on a report. So it would be useful if you could select oneither the criteria within the report, or the report criteria within Sage 200 if you want to enter ...
Guest almost 9 years ago in Criteria 1 Idea Accepted - Gauging Support