Skip to Main Content
Sage 200 UKI Ideas Portal
ADD A NEW IDEA

Processing

Showing 8

Sage 200 Standard - BOM allocation

We need to be able to allocate stock from a BOM and build when the item is physically built. Without this function we have only 2 options (1) build at the start but if the physical build is then not for a few weeks the physical stock quantities fo...
Guest about 2 years ago in Processing 0 Idea Accepted - Gauging Support

Opportunity to substitute items out of stock when processing a BOM to an alternative

Would it be possible to amend BOM to give users the opportunity to substitute any component items which are out of stock to use an alternative when processing the build, rather than users having to go into the BOM record and change it manually?
Guest over 8 years ago in Processing 0 Idea Accepted - Gauging Support

Add a Deselect option for unassigning batch/serial numbers from a BOM Build

Currently, when building a BOM within Record Built Items, serial numbered components are auto-selected. Sometimes this is fine but sometimes it is not correct. Although you can manually change these if you have 600 (in the case of my client) they ...
Michelle White over 6 years ago in Processing 0 Idea Accepted - Gauging Support

Stock return to deal with by products

A means to send by-products to stock. If we modify a build item and a modification done, i.e. the removed component could be re-used, through the build process and the bill of materials, effectively have two complete build parts. We buy a bike, we...
Guest over 2 years ago in Processing 0 Idea Accepted - Gauging Support

BOM rounding errors in units of measure

This can create error in works order processing and needs resolving
Guest about 9 years ago in Processing 0 Idea Accepted - Gauging Support

Amending date when reversing BOM build

You should be able to amend the reversal date of the BOM build when reversing it. A date field shows up, but is greyed out and automatically populated with today's date. This causes issues when trying to do a retrospective Stock Valuation because ...
John Dunn over 6 years ago in Processing 0 Idea Accepted - Gauging Support

BOM Maximum Build should go down all levels

When you perform a BOM Maximum build it doesn't check the sub assemblies to see if there are enough components available, you have to click on each sub assembly and perform a maximum build, it then doesn't transfer this back to the front screen so...
Guest over 6 years ago in Processing 0 Idea Accepted - Gauging Support

Post suggested selling price from BOM costing to Stock Control selling price at the touch of a button.

This feature would greatly speed up the process, as we add hundreds of new parts daily that use the stock control selling price in sales order quotations
Guest about 8 years ago in Processing 0 Idea Accepted - Gauging Support