Skip to Main Content
Sage 200 UKI Ideas Portal

Please note the following Sage 200 Ideas Portal Guidelines apply to the use of this portal.

ADD A NEW IDEA

Clear

Ideas

Showing 26

Setting to change Default Journal VAT Type

1. To have a system setting that allows you to specify a default journal VAT Type/VAT Code rather than having to change it on every new manual journal that&s entered.2. To be able to change the default VAT Code from &0 -Exempt& when th...
Guest over 9 years ago in Journal Entry 0 Idea Accepted - Gauging Support

A nominal journal report to be auto generated and spooled immediately after a journal is posted. This should include the Journal Reference\Number

A nominal journal report to be auto generated and spooled immediately after a journal is posted. This should include the Journal Reference\Number
Guest almost 10 years ago in Journal Entry 0 Idea Accepted - Gauging Support

For an option to have Nominal Journal lines alternate colours when entering

To make things clear, a customer of ours has asked if there was a way of making every other line on entering a journal or processing a journal template another colour. This way it is easier to see which line you are on currently, as the light gree...
Guest about 8 years ago in Journal Entry 0 Idea Accepted - Gauging Support

Add a Deselect option for unassigning batch/serial numbers from a BOM Build

Currently, when building a BOM within Record Built Items, serial numbered components are auto-selected. Sometimes this is fine but sometimes it is not correct. Although you can manually change these if you have 600 (in the case of my client) they ...
Michelle White almost 8 years ago in Processing 0 Idea Accepted - Gauging Support

BOM rounding errors in units of measure

This can create error in works order processing and needs resolving
Guest about 10 years ago in Processing 0 Idea Accepted - Gauging Support

Stock return to deal with by products

A means to send by-products to stock. If we modify a build item and a modification done, i.e. the removed component could be re-used, through the build process and the bill of materials, effectively have two complete build parts. We buy a bike, we...
Guest over 3 years ago in Processing 0 Idea Accepted - Gauging Support

Assign Projects to a Nominal Journal entry

You can currently assign a project to a nominal receipt and payment BUT you can not assign it on a nominal Journal.
Vanessa Watson almost 8 years ago in Journal Entry 0 Idea Accepted - Gauging Support

Amending date when reversing BOM build

You should be able to amend the reversal date of the BOM build when reversing it. A date field shows up, but is greyed out and automatically populated with today's date. This causes issues when trying to do a retrospective Stock Valuation because ...
John Dunn almost 8 years ago in Processing 1 Idea Accepted - Gauging Support

BOM Maximum Build should go down all levels

When you perform a BOM Maximum build it doesn't check the sub assemblies to see if there are enough components available, you have to click on each sub assembly and perform a maximum build, it then doesn't transfer this back to the front screen so...
Guest almost 8 years ago in Processing 0 Idea Accepted - Gauging Support

Auto VAT Journal

Unlike Sage 50, Sage 20 0does not seem to post a VAT journal after a VAT return has been competed. if you can do it with Sage 50 you should be able to do the same with Sage 200....
Guest almost 9 years ago in Journal Entry 0 Idea Accepted - Gauging Support